Road Committee -
Mike Schaeffer/Chair
Committee Members: Mickey Ritter, Richard Wines, Brian Parker, Kenny Miller
Links to individual reports submitted periodically to the HV Maintenance Board are linked below. To view individual reports, select the appropriate link to open automatically. You may then review or download to print the report.
Any activity that causes material change to the condition of the roadway shall be subject to permitting, inspection, and remuneration for any damages caused. A permit fee of $25 shall be required for any new connection (such as, but not limited to, a driveway) or changes to an existing connection to any roadway maintained by RHVM, Inc. A drawing(s) and/or photograph(s) with details of the location, as well as measurements is required. If RHVM, Inc. determines that a culvert is required, the material cost of the culvert will be the responsibility of the property owner. RHVM, Inc. will install the culvert at no additional cost.